Interview by Ferd Eggan and Edy Scripps with Danny Castillo, a representative of the US Army Corps of Engineers, then commentary afterward with Alexis Massol of the Adjuntas Academy of Art and Culture. Also with Bob Lederer and Mike Hansen.
Army Corps of Engineers representative revealed the extent of the so-called “flood control” project in Maraguez which had already displaced 450 people from there. Alexis shared that the dam’s purpose was to provide hydroelectric power for future industries as part of the 2020 Plan which includes the development of Puerto Rico for the benefit of multinational corporations, causing environmental and physical damage to the island and its people.